Drains are perfectly level every time

The Finish Line drainage system allows floor drains and cleanouts to be adjusted up and down after they have been poured in concrete.  Drains that have been tilted out of level during the pour can also easily be releveled.  This results in the finished drain or cleanout being perfectly level with the finished floor every time.

With so many commercial drainage choices, why would a contractor change the way they have always installed drains? 

The answer is two-fold. First, Finish Line offers a tremendous time savings at installation. The coring base is installed, and set to the approximate floor level and you are done. No more boxing out drains, taping drain heads to protect them, or jack hammering floor drains that are not level to the finished floor. 

The second, and most important, reason that Finish Line is a better choice is because the finished drain heads are perfectly level to the finished floor.  Perfectly level floor drains and cleanouts make the entire project look better, for the life of the building.  Perfectly level floor drains and cleanouts not only speaks to the quality of the product, but to the quality of the installing contractor too.